CMMI认证

Excellus Solutions, LLC-2018-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Project Locations do not significantly affect the way organizational processes are implemented in the organization.)
Customer (Not Relevant: Organization does not differentiate processes to be followed based on customer domains.)
Size (Not Relevant: The way in which organization’s processes are implemented in the appraised organization does not vary significantly based on size. Standard methodology is followed in the define processes and hence there is no significant impact on process implementation)
Organizational Structure (Not Relevant: All projects follow the same organization structure)
Type of Work: Projects are differentiated on the basis of the type of work being performed. There are two types of development projects in the organization. (1) Development Projects and (2) DevOps Projects. Detailed descriptions are provided in Section 7.2.2 of this plan. The type of the work between the two projects types of projects does vary significantly
Sampling Factor Values: Development Projects (Type of Work): Projects with only development scope of work
DevOps Projects (Type of Work): Projects with development and operations scope of work
Subgroups: Exc_Dev: Projects with only development scope of work
30 People, 3 Basic Units
– Development Projects
Exc_DevOps: Projects with development and operations scope of work
39 People, 2 Basic Units
– DevOps Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Excellus Solutions, LLC-2018-CMMI3