| Sampling Factors: |
Location (Not Relevant: The OU is operating from one location (Petaling Jaya, Malaysia) only)
Customer (Not Relevant: The projects in each subgroups is of similar and homogeneous in nature. The projects also follows Fusionex standard processes without any tailoring / customization in each sub group. Hence Customer is not an influencing factor)
Size (Not Relevant: The projects and work groups at Fusionex are of small in size and size is not influencing the process followed)
Organizational Structure (Not Relevant: The organization unit is small and the organization structure is flat. The process is not influenced by the organizational strcuture)
Type of Work (Not Relevant: All projects in the OU are of software development in nature. Hence Type of work is not an influencing factor)
Life Cycles: The projects in the OU are following conventional life cycles and agile methods. The process followed is influenced by the lifecycle adopted |
| Sampling Factor Values: |
WF (Life Cycles): Waterfall life cycle
AG (Life Cycles): Agile methods |
| Subgroups: |
FUSWF: Subgroup consisting of projects following waterfall life cycle
15 People, 4 Basic Units
– WF
FUSAG: Subgroup consisting of projects following agile methods
10 People, 2 Basic Units
– AG |