| Sampling Factors: |
Location (Not Relevant: There is exists only one location for the system development department so there is no impact on how the projects are developed)
Customer (Not Relevant: Regardless of the type of customer external or internal, processes are same. So there is no impact of process adoption.)
Size: Greater than >60 THCM is Large size project. Between 30-60 THCM is Medium size project and less than <30 is=”” small=”” size=”” project.=”” all=”” type=”” of=”” project=”” follow=”” all=”” the=”” process=”” areas=”” but=”” may=”” be=”” tailored=”” according=”” to=”” the=””>
Organizational Structure (Not Relevant: Support level is provided at corp level and standard processes along with tailoring options are provided so org structure does not impact the way work in performed.)
Type of Work (Not Relevant: Different type of work of (Large/Medium/Small) does not affect process utilization although it may be tailored per guidelines.) |
| Sampling Factor Values: |
Large (Size): Greater than 60 Technical Head Count Months (THCM)
Medium (Size): Between 60 and 30 THCM is Medium size project.
Small (Size): Less than 30 THCM is Small size project. |
| Subgroups: |
Large Size: > 60 THCM is Large
11 People, 1 Basic Units
– Large
Medium Size: Between 60 and 30 THCM is Medium size projects
13 People, 2 Basic Units
– Medium
Small Size: Less than 30 THCM is Small size project
10 People, 2 Basic Units
– Small |