CMMI认证

GHSP-2015-CMMI2

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is performed at GHSP using the standard GHSP process suite.)
Customer: Work is in support of equipment built and maintained within GHSP and at customer sites for the automotive industry. This is the sole sampling factor affecting project sampling for this appraisal.
Size (Not Relevant: All projects are small (10 or fewer engineers). Work is performed in a consistent fashion for all projects)
Organizational Structure (Not Relevant: All work is done by a single, small, software group.)
Type of Work (Not Relevant: All software efforts are in support of the automotive industry (shift by wire).)
Sampling Factor Values: Software (Customer): Work is in support of equipment built and maintained within GHSP and at customer sites. This is the sole sampling factor affecting project sampling for this appraisal.
Second Value (Customer): Second Value
Subgroups: Software: Software Projects
24 People, 4 Basic Units
– Software

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:GHSP-2015-CMMI2