CMMI认证

G&L Group-2016-Sponsor Requests No ML

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects located in Buenos Aires)
Customer (Not Relevant: Work is performed same way no matter the customer)
Size (Not Relevant: Work is performed same way no matter the size)
Organizational Structure (Not Relevant: Same org structure serving all projects)
Type of Work: Projects are divided in types: Integral (whole life cycle), construction and testing, only testing
Sampling Factor Values: Integral (Type of Work): Project covering whole life cycle
Construction and testing (Type of Work): Projects covering part of the life cycle
Testing (Type of Work): Testing services project
Subgroups: S1: Integral Projects
12 People, 3 Basic Units
– Integral
S2: Construction and testing projects
4 People, 1 Basic Units
– Construction and testing
S3: Testing projects
4 People, 1 Basic Units
– Testing

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:G&L Group-2016-Sponsor Requests No ML