CMMI认证

ARHS Group-2016-CMMI2

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects use the same processes whatever the location where is the team, Luxembourg or Belgium)
Customer (Not Relevant: All projects are managed with the same processes whatever the customer)
Size (Not Relevant: All projects follow the same processes whatever the size)
Organizational Structure (Not Relevant: All projects are managed by the same organizational structure)
Type of Work (Not Relevant: All projects are dedicated to develop and maintain software for customers – most do both development and maintenance)
Entire Organizational Unit: There is no factor to differentiate conditions under which work is performed. All the projects are in this subgroup.
Sampling Factor Values: All projects (Entire Organizational Unit): This subgroup contains all the projects of the Organizational Unit.
No projects (Entire Organizational Unit): This is a subgroup without any project.
Subgroups: All projects: This subgroup contains all the projects in the Organizational Unit.
118 People, 29 Basic Units
– All projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:ARHS Group-2016-CMMI2