| Sampling Factors: |
Location (Not Relevant: Organization unit is operational from one location at Guangzhou, Guangdong Province, China PRC only and hence not considered to be relevant for sampling.)
Customer (Not Relevant: Organization unit serves Government customers in Guangdong Province, China PRC and hence not considered to be relevant for sampling. Customers do not have influence on the OU processes and hence not considered to be relevant for sampling.)
Size: Size the basic units are classified as Small and Medium. Basic units are either Small sized (Effort: <=3 months=”” duration)=”” or=”” medium=”” sized=”” (effort:=””> 3 months to <= 6=”” months=”” duration)in=”” the=”” organizational=”” unit=”” and=”” hence=”” considered=”” to=”” be=”” relevant=”” for=””>
Organizational Structure (Not Relevant: Organizational structure across all the basic units in the organizational unit remains the same and hence not considered to be relevant for sampling.)
Type of Work (Not Relevant: Software life cycle is all New Development for all basic units, and developed in the similar technology (Java) hence considered not relevant for sampling.)
|
| Sampling Factor Values: |
Small (Size): Software new development projects of Small size (Effort: <= 3=””>
Medium (Size): Software new development projects of Medium size (Effort: > 3 and <= 6=””> |
| Subgroups: |
SG # 1: Software new development projects for government customers of small size developed in air traffic control domain using Java technologies.
11 People, 1 Basic Units
– Small
SG # 2: Software new development projects for government customers of medium size developed in air traffic control domain using Java technologies.
18 People, 2 Basic Units
– Medium |