Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Only 1 location.)
Customer (Not Relevant: There is only one specific type of customer – electronic power companies.)
Size (Not Relevant: The basic units are all the same size, or very similar size.)
Organizational Structure (Not Relevant: All work is project structured. The process followed is the same for each project.)
Type of Work (Not Relevant: All development projects use the same processes, regardless of embedded or application development.)
Entire OU: All projects
Sampling Factor Values: All projects (Entire OU): All projects
No projects (Entire OU): No projects
Subgroups: Software development (embedded and application): Software development from requirements to test
33 People, 11 Basic Units
– All projects