| Sampling Factors: |
Location (Not Relevant: OU located only in Guiyang)
Customer (Not Relevant: The client only intervene in stating the requirements and receiving the product, so the organization is able to use its methodology and the process has been used in the same way.)
Size (Not Relevant: All projects are similar size, work is not performed differently based on the size of the projects)
Organizational Structure (Not Relevant: The Software development structure for the organizational unit is simple, there is only one area of software development without sub-divisions)
Type of Work: Difference between development of waterfall and iteractive |
| Sampling Factor Values: |
Waterfall (Type of Work): Waterfall projects
Iteractive (Type of Work): Iteractive projects |
| Subgroups: |
Waterfall: Waterfall projects
3 People, 1 Basic Units
– Waterfall
Iteractive: Iteractive projects
4 People, 1 Basic Units
– Iteractive |