CMMI认证

Guizhou Real Power Construction Engineering co. LTD-CMM

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: No effect. Projects and support groups at same location in Guiyang)
Customer (Not Relevant: The products are developed as generic items. Currently no customer differentiation occurs.)
Size (Not Relevant: All small sized projects and no process differentiation occurs on the basis of size)
Organizational Structure (Not Relevant: All projects are conducted within the one department (Development Unit). There is no impact from organisational structure on project differentiation)
Type of Work: Waterfall and Iterative development applications
Sampling Factor Values: Waterfall (Type of Work): Waterfall development applications
Iterative (Type of Work): Iterative development applications
Subgroups: Waterfall: Waterfall development applications
8 People, 2 Basic Units
– Waterfall
Iterative: Iterative development applications
4 People, 1 Basic Units
– Iterative

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Guizhou Real Power Construction Engineering co. LTD-CMM