| Sampling Factors: |
Location (Not Relevant: No effect. Projects and support groups at same location in Guiyang)
Customer (Not Relevant: The products are developed as generic items. Currently no customer differentiation occurs.)
Size (Not Relevant: All small sized projects and no process differentiation occurs on the basis of size)
Organizational Structure (Not Relevant: All projects are conducted within the one department (Development Unit). There is no impact from organisational structure on project differentiation)
Type of Work: Waterfall and Iterative Lifecycle model |
| Sampling Factor Values: |
Waterfall (Type of Work): Waterfall model
Iterative Lifecycle (Type of Work): Iterative Lifecycle model |
| Subgroups: |
Waterfall: Waterfall model
8 People, 2 Basic Units
– Waterfall
Iterative Lifecycle: Iterative Lifecycle model
4 People, 1 Basic Units
– Iterative Lifecycle |