| Sampling Factors: |
Location (Not Relevant: The factor is determined as not affected, Because all active projects are located in Beijing)
Customer (Not Relevant: The factor is determined as not affected, because all projects were performed for state grid.)
Size (Not Relevant: A.Large B.Medium C.Small. The factor is determined as not affected, Because all active projects are in medium size class.)
Organizational Structure: (A).Smart Grid Electric Center (B).Software Center (C).Innovation Center
Type of Work (Not Relevant: The factor is determined as not affected, because all active projects are software development projects.) |
| Sampling Factor Values: |
Smart Grid Electric Center (SGC) (Organizational Structure): The projects of SGC. All divisions adopt the same process. However, the consistence of adopting process should be checked.
Software Center (SC) (Organizational Structure): The projects of SC.
Innovation Center (IC) (Organizational Structure): The projects of IC. |
| Subgroups: |
SG 1: The software R&D projects of SGC
16 People, 2 Basic Units
– Smart Grid Electric Center (SGC)
SG 2: The software R&D projects of SC
21 People, 2 Basic Units
– Software Center (SC)
SG 3: The software R&D projects of IC
15 People, 3 Basic Units
– Innovation Center (IC) |