| Sampling Factors: |
Location (Not Relevant: All projects are developed in the same location so the location does not affect how projects are managed.)
Customer (Not Relevant: The different clients do not affect how projects are managed.)
Size: Large size projects are greater than 30 man months, medium size are between 10 and 30 man months, small projects are of less than 10 man months.
Organizational Structure (Not Relevant: All projects are under the same OU.)
Type of Work (Not Relevant: All project development are of similar types of products.) |
| Sampling Factor Values: |
Large (Size): Greater than 30 man months
Medium (Size): Between 10 and 30 man months.
Small (Size): Less than 10 man months |
| Subgroups: |
Large Projects: Greater than 30 man months
30 People, 2 Basic Units
– Large
Medium Projects: Between 10 and 30 man months.
33 People, 3 Basic Units
– Medium
Small Projects: Less than 10 man months
15 People, 2 Basic Units
– Small |