Organization Name:
(组织名称) Hangzhou Huachen Electric Power Control Co., Ltd.
(组织名称) Hangzhou Huachen Electric Power Control Co., Ltd.
Organizational Unit:
(组织单位) New Software Development Projects in Development Department, QA Department, and Training Function in Comprehensive Management Department.
(组织单位) New Software Development Projects in Development Department, QA Department, and Training Function in Comprehensive Management Department.
Maturity Level:
(成熟度) Maturity Level 3
(成熟度) Maturity Level 3
Appraisal End Date:
(评估结束日期) Apr 27, 2018
(评估结束日期) Apr 27, 2018
Lead Appraiser:
(主任评估师) Chen Wang
(主任评估师) Chen Wang
Sponsor:
(发起人) Jintao Zhang
(发起人) Jintao Zhang
- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location (Not Relevant: Although the 3 projects are in different customer sites (Hangzhou for P1 and P2, Jiaxing for P3 ) for development, but there is no process difference with respect to different locations since different customers in those locations do not mandate process implementation neither tools used, and no process difference after project tailoring.)
Customer (Not Relevant: Different customers for different projects, but there is no process difference between different customers since customers do not mandate process implementation neither tools used, and no process difference after project tailoring.)
Size: P2 is a small project (duration/effort < 3month/1man-year)=”” with=”” p1=”” and=”” p3=”” as=”” large=”” projects,=”” this=”” creates=”” differences=”” in=”” feasibility=”” analysis/evaluation=”” at=”” project=”” kickoff,=”” monitoring=”” and=”” control,=”” architectural=”” design,=”” and=”” system=””>
Organizational Structure (Not Relevant: The 3 projects are all from Development Department with no process difference after tailoring.)
Type of Work (Not Relevant: All 3 projects are new software development with same process execution after tailoring)Sampling Factor Values: Large Project (Size): Duration >= 3 month, or Effort >= 1 man-year
Small Project (Size): Duration < 3=”” month,=”” or=”” effort=””>< 1=””>Subgroups: 1: Large Project with Duration >= 3 month, or Effort >= 1 man-year
9 People, 2 Basic Units
– Large Project
2: Small Project with Duration < 3=”” month,=”” or=”” effort=””>< 1=””>
3 People, 1 Basic Units
– Small Project
说明:该信息摘自CMMI官网公示,更多详情请点击这里查看。注:CMMI认证有效期3年,过期链接失效。