- Sampling Summary:
(抽样汇总) -
Sampling Factors: Location: Each location shows some different process performance. (PPBs, PPMs)
Customer (Not Relevant: Major customer is Defense Acquisition Program Administration of Korea.)
Size (Not Relevant: All weapon system development project including small project need to follow same Korean military standard and guidelines. Size is not a tailoring factor of OU.)
Organizational Structure (Not Relevant: The organization structure is aligned by location.)
Type of Work (Not Relevant: OU develops sub-systems of weapon system. The other type of work is out of appraisal scope.)Sampling Factor Values: YONGIN (Location): Yongin-si, Gyeonggi-do
PANGYO (Location): Seongnam-si, Gyeonggi-do
GUMI (Location): Gumi-si, Gyeongsangbuk-doSubgroups: Location 1: Radar, RF Seeker, Altimeter development
152 People, 2 Basic Units
– YONGIN
Location 2: IT solutions, Comm,system, Eletro-optic system, Image Seeker Development
345 People, 10 Basic Units
– PANGYO
Location 3: USV/UUV Development
177 People, 2 Basic Units
– GUMI