CMMI认证

Jiangsu Haowei Transport Group Co., Ltd.-2016-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: [Not Relevant] Just one location for the Development department so there is no impact on where the projects are developed. All processes are applied at this location.)
Customer (Not Relevant: [Not Relevant.] Although private and government customers are supported, the type of customer does not impact the way work is performed for any type of customer. All processes are implemented to all customers.)
Size (Not Relevant: [Not Relevant.] All projects (Controls type (C&M) or Detection type (D&A)) tend to require similar efforts so FTE size does not matter the way work is performed.)
Organizational Structure (Not Relevant: [Not Relevant] Development Department is where all the projects are developed. Standard processes are used accordingly so org structure does not impact the way work is performed.)
Type of Work: Relevant] There are two types of work: The Controls and Management (C&M) type of projects requires consideration of intense testing in its intended environment. The Detection and Analysis (D&A) type of projects emphasize on logic design and data manipulation in local environment. Both types follow full development cycle and utilize all processes in place accordingly.
Sampling Factor Values: C&M (Type of Work): The Controls and Management (C&M) type of projects requires consideration of intense testing in its intended environment.
D&A (Type of Work): The Detection and Analysis (D&A) type of projects emphasize on logic design and data manipulation in local environment.
Subgroups: C&M: The Controls and Management (C&M) type of projects requires consideration of intense testing in its intended environment.
16 People, 2 Basic Units
– C&M
D&A: The Detection and Analysis (D&A) type of projects emphasize on logic design and data manipulation in local environment.
13 People, 2 Basic Units
– D&A

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Jiangsu Haowei Transport Group Co., Ltd.-2016-CMMI3