| Sampling Factors: |
Location (Not Relevant: All HT projects in the sample perform work in the greater Washington, DC metropolitan area, with no process distinctions due to location.)
Customer (Not Relevant: All HT projects perform work directly for Federal Government clients in a ‘Prime’ contractor status or managing the delivery of the project with the standard processes.)
Size (Not Relevant: All HT projects that are equal to or greater than 5 FTEs execute the organizational processes.)
Organizational Structure (Not Relevant: The HT organization is flat, with little difference between the projects’ process execution due to org structure.)
Type of Work (Not Relevant: All projects generally perform the same kind of work. No process distinction based on type of work.)
All Basic Units: All projects that deliver software |
| Sampling Factor Values: |
All Basic Units (All Basic Units): All basic unit that deliver software.
No Basic Units (All Basic Units): No Basic Units. |
| Subgroups: |
Development and Modernization: Projects of HT using the Organizational Standard Processes, the PM Handbook, and delivering primarily software or systems engineering products.
28 People, 4 Basic Units
– All Basic Units |