CMMI认证

Guizhou HuaTeng Intelligent Technology Co., Ltd.-2013-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Location does not impact the way work is performed.)
Customer (Not Relevant: Customer type does not impact the way work is performed.)
Size: There are two types of BU in the OU: Major (>30 Technical Head Count Months (THCM) and Medium (<30 thcm).=”” the=”” enhancement=”” or=”” release=”” maintenance=”” type=”” of=”” small=””>< 10=”” thmc)=”” work=”” does=”” not=”” impact=”” the=”” way=”” processes=”” are=””>
Organizational Structure (Not Relevant: The Organizational Structure does not impact the way work is performed.)
Type of Work (Not Relevant: The Type of work (Release Maintenance or Enhancement) though small in size does not impact the way work is performed.)
Sampling Factor Values: Major Work (Size): The Major work involves the size of more than 30 THCM.
Medium Work (Size): The Medium Work involves the size of less than 30 THCM.
Subgroups: Major Work Size: This subgroup contains project that is of Major Work Size (>30 THCM).
11 People, 2 Basic Units
– Major Work
Medium Work Size: This subgroup contains project that is of Medium Work size (10-30 THCM).
5 People, 1 Basic Units
– Medium Work

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Guizhou HuaTeng Intelligent Technology Co., Ltd.-2013-CMMI3