Huizhi Intelligence Technology Co., Ltd-2019-CMMI5

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: No. The same location)
Customer (Not Relevant: No. Customer vary, but standard process is used.)
Size: Hypothesis testing of the process performance parameters indicates that size is a relevant sampling factor.
Organizational Structure (Not Relevant: No. Single structure.)
Type of Work (Not Relevant: No. All development work)
Sampling Factor Values: Large projects (Size): Size is greater than 150 UCP
Small (Size): Size is less than 150 UCP
Subgroups: Large projects: Size is greater than 150 UCP
30 People, 4 Basic Units
– Large projects
Small Projects: Size is less than 150 UCP
14 People, 2 Basic Units
– Small