CMMI认证

Hydroid-2016-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All work is perfomed in Pocasset, MA, USA)
Customer (Not Relevant: Hydroid serves various customers worldwide. This does not present any variation in development of production processes in use.)
Size (Not Relevant: Projects vary from small to large. This does not present any variation in the development or production processes in use.)
Organizational Structure (Not Relevant: The development and production processes do not vary based on org structure. Each part of operations has a role to play in executing the HyPro process.)
Type of Work: Unique processes are followed for each of development and production. Production projects produce a known configuration while development produces a new configuration.
Sampling Factor Values: Development (Type of Work): Development projects present a product configuration requiring a new design.
Production (Type of Work): Production projects present a product configuration requiring minimal or no new design.
Subgroups: Development: The development subgroup that requires some new design work to deliver a unique configuration.
25 People, 12 Basic Units
– Development
Production: The production subgroup represents projects that deliver known configurations with little or no new design.
32 People, 19 Basic Units
– Production

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Hydroid-2016-CMMI3