| Sampling Factors: |
Location (Not Relevant: The factor is determined as not affected, because all firmware development team of the OU are located in Guangzhou.)
Customer (Not Relevant: The factor is determined as not affected. Considering the safety requirements for battery, the FW DEV follows the same process standard in every firmware development projects.)
Size (Not Relevant: The factor is determined as not affected. The product types of the OU are limited. All firmware development projects are categorized in one size category.)
Organizational Structure (Not Relevant: The factor is determined as not affected because all projects are performed by FW DEP. There is no subsidiary department in FW DEP.)
Type of Work (Not Relevant: The factor is determined as not affected, because only the firmware development works are included in the appraisal.)
Product Line: A) BMS (Battery management system) B) Charger |
| Sampling Factor Values: |
BMS (Battery management system) (Product Line): The projects develop BMS firmware. The BMS projects will follow the standard process of ICC Electronics.
Charger (Product Line): The projects develop firmware of Charger. The processes of TS, VER and VAL might differ, due to the MCU types and the Characteristics of products. |
| Subgroups: |
SG 1: BMS development projects
8 People, 2 Basic Units
– BMS (Battery management system)
SG 2: Charger firmware development projects
9 People, 3 Basic Units
– Charger |