| Sampling Factors: |
Location (Not Relevant: Single location)
Customer (Not Relevant: While customers may insist at times on a particular template being used for an engineering document (requirements specification normally) they have not so far insisted on a different process being followed from what is used at Indus Net. Thus, all projects follow the same process irrespective of customer.)
Size (Not Relevant: Projects are of roughly similar sizes. Thus, there has been no differentiation of the process to be followed based on size.)
Organizational Structure (Not Relevant: This is one group where all follow the same process)
Type of Work (Not Relevant: All projects follow the same lifecycle)
Projects: In the absence of other sampling factors for differentiation between projects, Projects [‘Dev_Maint’ and ‘Other’] has been taken. Other is a ‘NULL’ set. |