CMMI认证

Trade-2014-Van Information Services Co.-2014-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Single location (Taipei).)
Customer (Not Relevant: Work is not performed differently depending on customer (same process /behavior followed regardless of customer).)
Size (Not Relevant: Size does not influence significantly the process followed by projects.)
Organizational Structure (Not Relevant: There are no department specific processes or guidelines.)
Type of Work: ASP and SI, that will affect PP, PI, VAL process.
Life Cycle Model: 3 Develop Life Cycle model: Waterfall, Evolution, Maintain, that will affect PP, PMC and engineering process.
Sampling Factor Values: ASP (Type of Work): Application Service Provider
SI (Type of Work): System Integration
Waterfall (Life Cycle Model): Waterfall Life Cycle Model
Evolution (Life Cycle Model): Evolution Life Cycle Model
Maintain (Life Cycle Model): Maintain Life Cycle Model
Subgroups: Evolution ASP: System develop on Trade-Van by Evolution
24 People, 4 Basic Units
– ASP
– Evolution
Waterfall ASP: System develop on Trade-Van by Waterfall
10 People, 1 Basic Units
– Waterfall
– ASP
Evolution SI: System develop on customer site by Evolution
16 People, 2 Basic Units
– SI
– Evolution
Waterfall SI: System develop on customer site by Waterfall
33 People, 2 Basic Units
– Waterfall
– SI
Maintain ASP: System maintain on Trade-Van
14 People, 3 Basic Units
– ASP
– Maintain

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Trade-2014-Van Information Services Co.-2014-CMMI3