CMMI认证

NEWGATEWAY INFORMATION TECHNOLOGY CO.,LTO.-2014-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Although the 3 basic units are in two locations (2 in ZhuHai and 1 in ShenZhen), there is no process difference between them.)
Customer (Not Relevant: There are 2 types of clients, but the processes used to provide products or services to those clients are the same.)
Size (Not Relevant: Although different sizes (large, small) exist for the 3 basic units, but there is no effects on processes execution with different sizes.)
Organizational Structure (Not Relevant: All processes are the same between different department or division in OU.)
Type of Work: There are two types of work for development projects: New Development, and Feature Enhancement. This difference causes RD, TS, PI, VER related processes differences.
Sampling Factor Values: New Development (Type of Work): All new product development
Feature Enhancement (Type of Work): Feature enhancement on the basis of current code base
Subgroups: 1: New Development
7 People, 2 Basic Units
– New Development
2: Feature Enhancement
3 People, 1 Basic Units
– Feature Enhancement

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:NEWGATEWAY INFORMATION TECHNOLOGY CO.,LTO.-2014-CMMI3