| Sampling Factors: |
Location (Not Relevant: Although the 3 basic units are in two locations (2 in ZhuHai and 1 in ShenZhen), there is no process difference between them.)
Customer (Not Relevant: There are 2 types of clients, but the processes used to provide products or services to those clients are the same.)
Size (Not Relevant: Although different sizes (large, small) exist for the 3 basic units, but there is no effects on processes execution with different sizes.)
Organizational Structure (Not Relevant: All processes are the same between different department or division in OU.)
Type of Work: There are two types of work for development projects: New Development, and Feature Enhancement. This difference causes RD, TS, PI, VER related processes differences. |