| Sampling Factors: |
Location (Not Relevant: Locations of the organizational unit sites have no impact on the way work is performed. The sample covers 100% of the locations.)
Customer (Not Relevant: The customers served by the organizational unit have no impact on the way work is performed.)
Size: The size of the products and services developed by the organizational unit has some impact on the way work is performed. These projects are performed by shared resources and depend on the size of the project. The Large size (> 50 Technical Head Count Months (THCM)), Medium (between 10 to 50 THMC) and Small (< 10=”” thcm).=”” the=”” small=”” project=”” size=”” may=”” adopt=”” the=”” abbreviated=”” version=”” of=””>
Organizational Structure (Not Relevant: The organizational structure of the organizational unit has no impact on the way work is performed.)
Type of Work (Not Relevant: The type of development undertaken by the organizational unit has no impact on the way work is performed.) |
| Sampling Factor Values: |
Large (Size): The Large size project is > 50 Technical Head Count Months (THCM).
Medium (Size): The Medium size project is between 10 to 50 THCM. |
| Subgroups: |
Large Size: The Large size is > 50 Technical Head Count Months (THCM)
16 People, 2 Basic Units
– Large
Medium Size: Medium size is between 10 to 50 THCM
8 People, 1 Basic Units
– Medium |