| Sampling Factors: |
Location (Not Relevant: OU manages its activities from Mumbai location only. Hence this was not considered as critical factor.)
Customer (Not Relevant: All projects are executed for internal Reliance Infra teams hence no process variation is expected based on customer.)
Size (Not Relevant: There is no significant variation in sizing of the projects that result in different process performance. Hence size was not observed to be a critical factor.)
Organizational Structure (Not Relevant: Based on the organizational structure, there is no specific process tailoring done hence no significant process variation based on organizational structure.)
Type of Work (Not Relevant: OU has projects with a similar development lifecycle projects. Hence this was not considered as sampling factor.)
Technology: OU has projects performed in two different technologies i.e. Domino and .Net. It was expected that this may have a bearing on process performance hence identified as sampling factor. |
| Sampling Factor Values: |
IBM Domino (Technology): This includes projects using IBM Domino technology
Dot Net (Technology): This includes projects using Dot Net technology |
| Subgroups: |
G1: This includes projects executed in IBM Domino technology
10 People, 3 Basic Units
– IBM Domino
G2: This includes projects executed in Dot Net technology
6 People, 2 Basic Units
– Dot Net |