Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All 6 projects are internally developed in the same location (Taipei) with no process difference with respect to location.)
Customer (Not Relevant: All the software R&D projects have the same customer (Department of Industrial Technology, Ministry of Economic Affairs) with no process difference.)
Size (Not Relevant: Although different sizes projects are in scope (small, medium, large), but there is no differences in process execution because they all follow the same processes after tailoring by using the templates and tools (IBM CQ, GitLab) provided by OU.)
Organizational Structure (Not Relevant: Although the 6 projects are from different R&D centers with cross-center matrix team, there is no process differences with different centers because software development projects in those centers all use same tools and templates (SRS, SDD, Test Plan, monthly reports).)
Type of Work (Not Relevant: All works are software research and development, this does not cause significant process difference between projects after tailoring.)
No Sampling Factor: there is no sampling factor exist for this appraisal
Sampling Factor Values: All Basic Units (No Sampling Factor): all basic units
No Basic Unit (No Sampling Factor): no basic unit
Subgroups: 1: All Basic Units
122 People, 12 Basic Units
– All Basic Units