| Sampling Factors: |
Location (Not Relevant: All 2 projects are internally developed in the same location (Taipei) with no process difference with respect to location.)
Customer (Not Relevant: All the large and medium software development projects have the same customer (Department of Industrial Technology, Ministry of Economic Affairs) with no process difference.)
Size (Not Relevant: Although large and medium size projects are in scope, but there is no differences in process execution.)
Organizational Structure (Not Relevant: The 2 projects are all in Digital Analytics Center, with no process differences.)
Type of Work (Not Relevant: All works are software development, this does not cause significant process difference between projects after tailoring.)
No Sampling Factor: no sampling factor exists for this appraisal |