Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Locations has no impact ont the project processes.)
Customer (Not Relevant: Customer has no impact ont the project processes.)
Size: Some process variations are possible due to project size.
Organizational Structure (Not Relevant: Org. Structure has no impact ont the project processes.)
Type of Work: Some process variations are possible due to the type of work.
Sampling Factor Values: Small (Size): Depending of the size (Small or Large) some process variation is acceptable
Large (Size): Depending on the size (Small or Large) some process variation is accpetable
Software Development (Type of Work): Depending on the type of work, such as software development or maintenance, some process variation is acceptable
Systems Engineering (Type of Work): Depending on the type of work, such as systems engineering, some process variation is acceptable
Subgroups: SG01: Software development with small BUs
552 People, 26 Basic Units
– Small
– Software Development
SG02: Software development with large BUs
520 People, 11 Basic Units
– Software Development
– Large
SG03: Large systems engineering BU
149 People, 1 Basic Units
– Systems Engineering