CMMI认证

Altech ISIS, A Division of Altech Information Technolog

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The location does not make a material difference to the way processes are applied by Altech ISIS. All the work is consistently performed irrespective of where it is performed.)
Customer (Not Relevant: The type of customer served by Altech Isis does not affect the way processes are executed or the way work is performed.)
Size (Not Relevant: The size of projects does not affect the way processes are executed. All projects and releases – Small, Medium and Large are required to follow the same processes and perform work in a consistent manner.)
Organizational Structure (Not Relevant: Organisational Structure of Altech Isis does not make any material difference to the way processes are applied by Altech ISIS to execute work)
Type of Work: Altech ISIS has two types of project work that leads to differences in the application of processes. The two types of work involves: a) Greenfield Development b) Enhancement and Maintenance.
Sampling Factor Values: Greenfield (Type of Work): Greenfield projects involve development of new systems and applications.
Enhancement and Maintenance (Type of Work): Involves Enhancement and Maintenance of existing systems and applications in Altech ISIS.
Subgroups: Greenfield: Greenfield projects involve development of new systems and applications across Altech Isis
65 People, 5 Basic Units
– Greenfield
Enhancement and Maintenance: This subgroup involves Enhancement and Maintenance of existing systems and applications in Altech ISIS
109 People, 10 Basic Units
– Enhancement and Maintenance

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Altech ISIS, A Division of Altech Information Technolog