CMMI认证

Jacobs Space Operations Group (JSOG)-2018-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All JSOG in scope projects are located at the Kennedy Space Center.)
Customer (Not Relevant: All work is done for same customer (NASA))
Size (Not Relevant: Size is fairly consistent and not a factor in how the work is performed or the process that are followed.)
Organizational Structure: Software work is done differently within the organizational structure. Within Electrical Systems and Applications & System Development.
Type of Work: There are differences in the way software is done for IT and software developed for the NASA customer.
Sampling Factor Values: Electrical Systems Engineering (ESE) (Organizational Structure): those providing NASA software development
BP App & Sys Dev (Organizational Structure): those providing IT software development
IT Development (Type of Work): BP App & Sys Dev
Elec Sys SW Dev (Type of Work): ESE – NASA Softwaee development
Subgroups: Software Dev for NASA: Design, development and integration of complex NASA software Development systems,
12 People, 2 Basic Units
– Electrical Systems Engineering (ESE)
– Elec Sys SW Dev
Dev team, SW Dev: Technical solutions for business requirements. The team provides business process analysis, requirements scoping, solution design, development and implementation.
17 People, 2 Basic Units
– BP App & Sys Dev
– IT Development

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Jacobs Space Operations Group (JSOG)-2018-CMMI3