| Sampling Factors: |
Location (Not Relevant: Not relevant since processes used do not depend on the location)
Customer (Not Relevant: Not relevant since the processes do not differ based upon the type of customer)
Size (Not Relevant: Not relevant – All projects are of a similar size (6-8 FTEs with a duration of 5-6 months) and the processes used do not differ based on size)
Organizational Structure (Not Relevant: Not relevant. It is an integrated and homogenous organization and processes do not differ based on the organization structure)
Type of Work: Different life cycles are defined in the organization”s process asset library – hence this would be a relevant factor to consider |
| Sampling Factor Values: |
Waterfall (Type of Work): Waterfall lifecycle – all projects
Iterative (Type of Work): Iterative lifecycle – null set |
| Subgroups: |
S1 ALL: All basic units belong to this sub group
21 People, 3 Basic Units
– Waterfall
S2 NULL: This is a NULL sub group and has only been identified for the sake of completeness
0 People, 0 Basic Units
– Iterative |