Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All the applications are developed at one location, i.e. Nanjing city only.)

Customer (Not Relevant: Work is not performed differently based on the customer served by that work. Most of the customers are the stakeholders in the field of the vehicle charging service.)

Size: Work is performed differently based on the size of the basic unit or support function. The projects could be categorized into:
1. Big Size Project: the function points are 200 above.
2. Medium/Small Size Project: the function points are less than 200 points.

Organizational Structure (Not Relevant: Work is not performed differently based on the organizational structure. All the R&D activities are conducted in the Product R&D Department.)

Type of Work (Not Relevant: Work is not performed differently based on the type of the work. Most of the work are software application development.)

Sampling Factor Values: Big Size Project (Size): The function points are 200 above.

Medium/Small Size Project (Size): The function points are less than 200 points.

Subgroups: Big Size Project: The function points are 200 above.
22 People, 2 Basic Units
– Big Size Project

Medium/Small Size Project: The function points are less than 200 points.
18 People, 2 Basic Units
– Medium/Small Size Project