| Sampling Factors: |
Location (Not Relevant: Single location (Wuhan))
Customer (Not Relevant: Though there are multiple customers, customer-specific needs or requirements are not leading to implementation differences)
Size (Not Relevant: There is no specific classification of projects into Large Medium Small buckets. Most projects are medium and size does not change Organizational tailoring guidelines)
Organizational Structure (Not Relevant: All projects follow same QMS (Quality Management System), there are no department specific processes or guidelines)
Type of Work: There are 2 types of work, System engineering and Software engineering. The life cycle activities will be impacted, e.g. planning, analysis, design, development, and testing, etc. |
| Sampling Factor Values: |
Software engineering (Type of Work): Software development projects
System engineering (Type of Work): Project scopes include system planning, software development, hardware and software integration and testing, and system installation |
| Subgroups: |
1: Project scopes include system planning, software development, hardware and software integration and testing, and system installation
44 People, 4 Basic Units
– System engineering
2: Software development projects
40 People, 3 Basic Units
– Software engineering |