CMMI认证

Korean Air-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Since all projects are in same city (Daejeon), location is not a relevant factor.)
Customer (Not Relevant: Since all projects are Government (Military), customer is not a relevant factor.)
Size (Not Relevant: Since all of projects are medium size, size is not a relevant factor.)
Organizational Structure (Not Relevant: Since all projects are in same organization (Development Department), organizational structure is not a relevant factor.)
Type of Work: Since there are two types of work (Performance Improvement Projects and System Development Projects), Type of Work is the relevant factor.
Sampling Factor Values: PIP (Type of Work): Performance Improvement Projects
SDP (Type of Work): System Development Projects
Subgroups: A: System development projects focused on performance improvement of previous products
80 People, 2 Basic Units
– PIP
B: System development projects for new defense system
141 People, 4 Basic Units
– SDP

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Korean Air-2017-CMMI3