CMMI认证

Xiamen Lenz Communication Co., Ltd.-2015-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The company and projects are based at one location)
Customer (Not Relevant: The same process is used for all customer types)
Size (Not Relevant: There is no process change for project size. Most are relatively small (less than 10 people) and around the same size.)
Organizational Structure (Not Relevant: The OU is small, so the same process is used throughout)
Type of Work (Not Relevant: All work uses the same process)
Required Sampling Factor: Required Sampling Factor
Sampling Factor Values: All Projects (Required Sampling Factor): Value to contain all projects in the OU
No projects (Required Sampling Factor): Null Value
Subgroups: All: Contains all projects in the OU
14 People, 2 Basic Units
– All Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权