| Sampling Factors: |
Location (Not Relevant: All projects are developed and integrated under the same organization structure in Bangkok.)
Customer (Not Relevant: All projects are developed for different customers there are 18 projects and all for different clients if the processes were developed around clients Zi-Argus would have 18 different sets of processes. Also some clients want full SW development and System Integration with the hardware, some clients just want SW development and do there own hardware and SW integration.)
Size: Project Size is based on cost and duration.
Organizational Structure (Not Relevant: All projects are developed and integrated under the same organization structure in Bangkok.)
Type of Work: Two key types of work, pure software development or software development plus hardware and system integration. |
| Sampling Factor Values: |
Large (Size): Project value > 3MB and duration > 2 months
Small (Size): Project Value <=3mb and=”” duration=””>< 2=””>
SW (Type of Work): Software Development only client does their own hardware and system integration
SI (Type of Work): Software development and hardware system integration. |
| Subgroups: |
Large/SW: Software development only with project value >3MB and duration >2 months
3 People, 2 Basic Units
– Large
– SW
Small/SW: Software development only with project value <=3mb and=”” duration=””><2>
9 People, 7 Basic Units
– SW
– Small
Large/SI: Software development with hardware integration with project value >3MB and duration >2 months
12 People, 5 Basic Units
– Large
– SI
Small/SI: Software development with hardware integration with project value <=3mb and=”” duration=””><2>
6 People, 4 Basic Units
– SI
– Small |