CMMI认证

FUJITSU LIMITED-2016-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: All projects in the OU reside in the Musashikosugi Office. Then, the location doesn”t affect the way of projects work.)
Customer (Not Relevant: The projects in the OU develop the in-house information system. The customer is only FUJITSU LIMITED. Then, the customer doesn”t affect the way of projects work.)
Size: The OU has only small size projects under twenty people. Then, the work among all projects in the OU is performed similarly.
Organizational Structure (Not Relevant: The OU has two departments. The projects in each department develop the in-house information system. The OU has only one set of organizational standard processes. Then, the work among all projects in the OU is performed similarly.)
Type of Work (Not Relevant: There are three types of system development in the OU. They are the application system development, system sustainment, and preparation of IT infrastructure. The system sustainment projects and the preparation of IT infrastructure projects are excluded from the scope. Then, the work among all projects in the OU is performed similarly.)
Sampling Factor Values: Small Size (Size): All basic units.(There is only small size project in the OU.)
Medium and Large Size (Size): No basic units.(There are no projects with this value.)
Subgroups: eSUP: There is only one subgroup in the OU.
50 People, 18 Basic Units
– Small Size

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:FUJITSU LIMITED-2016-CMMI3