| Sampling Factors: |
Location (Not Relevant: All BUs operate from the same location)
Customer (Not Relevant: Development Project has different type of customer with respect to the DEV & Maint Projects. However, this factor is redundant to the “Type of Work”)
Size: The three BUs have difference in size
Organizational Structure (Not Relevant: All BUs operate under the same Manager)
Type of Work: One Development and Two Dev & Maint BUs |
| Sampling Factor Values: |
Small (Size): BU having less than 10 FTE
Medium (Size): BU having 11 to 20 FTE
Large (Size): BU having more than 20 FTE
Development Project (Type of Work): Project in Pharmaceutical domain
Dev & Maint Projects (Type of Work): Both Projects are in Micro Finance domain |
| Subgroups: |
D-S: Development BU with Small FTE
6 People, 1 Basic Units
– Development Project
– Small
D&M-M: Development and Maintenance BU with Medium FTE
17 People, 1 Basic Units
– Medium
– Dev & Maint Projects
D&M-L: Development and Maintenance BU with Large FTE
41 People, 1 Basic Units
– Dev & Maint Projects
– Large |