CMMI认证

ValueLabs LLP-2013-CMMI5

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: As the organization and the OU are operating in a single unit, this is not a criteria for sampling.)
Customer (Not Relevant: As the organization has multiple customers and have not organized their business based on Vertical for any particular domain or account, this is not considered as a sampling factor.)
Size (Not Relevant: As the project sizes differ and have little effect on the use of process, this is not considered as a sampling factor.)
Organizational Structure: considered as a sampling factor – Development projects ; Verification and Validation services .
Type of Work: As the projects are categorized as Full Lifecycle Development (FLD), Partial Lifecycle Development (PLD) and QA / Testing only types, these form a basis for sampling.
Sampling Factor Values: Dev (Organizational Structure): Development projects
VnV (Organizational Structure): Units that only cover Verification and Validation works
FLD (Type of Work): Full Life Cycle Development
PLD (Type of Work): Partial Life Cycle development
QA / testing (Type of Work): Only cover testing of the development life cycle
Subgroups: 1: FLD
34 People, 3 Basic Units
– FLD
– Dev
2: PLD
44 People, 6 Basic Units
– Dev
– PLD
3: QA
83 People, 10 Basic Units
– QA / testing
– VnV

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:ValueLabs LLP-2013-CMMI5