CMMI认证

Loch Harbour Group, Inc.-2017-CMMI2

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The difference in location is redundant with the differences in type of work and therefore is subsumed by that factor)
Customer (Not Relevant: All customers sign a contract stating that they will use the OU’s standard processes)
Size: Large & Small Projects
Organizational Structure: Senior Vice Presidents
Type of Work: Based on overall work performed
Sampling Factor Values: Less than 30 FTEs (Size): Small Projects
Greater than or equal to 30 FTEs (Size): Large Projects
Nancy Massey Projects (Organizational Structure): Nancy Massey Projects
Bill Davis Projects (Organizational Structure): Bill Davis Projects
Mike Sandusky Projects (Organizational Structure): Mike Sandusky Projects
Technical Services Projects (Type of Work): Technical Services Projects
Professional Services Projects (Type of Work): Professional Services Projects
Subgroups: 1: Nancy, Large, Professional Services
45 People, 1 Basic Units
– Greater than or equal to 30 FTEs
– Nancy Massey Projects
– Professional Services Projects
2: Nancy, Small, Professional Services
36 People, 5 Basic Units
– Professional Services Projects
– Less than 30 FTEs
– Nancy Massey Projects
3: Bill, Small, Professional Services
49 People, 7 Basic Units
– Bill Davis Projects
– Less than 30 FTEs
– Professional Services Projects
4: Mike, Small, Technical Services
15 People, 4 Basic Units
– Less than 30 FTEs
– Mike Sandusky Projects
– Technical Services Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Loch Harbour Group, Inc.-2017-CMMI2