| Sampling Factors: |
Location (Not Relevant: Only one location and one QMS is followed)
Customer (Not Relevant: All customers are external and the process used is same)
Size (Not Relevant: Projects executed are medium size and the process does not differ to execute this size of projects)
Organizational Structure: Railways and Power
Type of Work (Not Relevant: Only development type of work is executed in the scope of the organization)
Lifecycle: Waterfall and Iterative |
| Sampling Factor Values: |
Railways (Organizational Structure): Railways
Power (Organizational Structure): Power
Waterfall (Lifecycle): Waterfall
Iterative (Lifecycle): Iterative |
| Subgroups: |
Rail/Iterative: Rail/Iterative
6 People, 1 Basic Units
– Railways
– Iterative
Power/Waterfall: Power/Waterfall
5 People, 1 Basic Units
– Power
– Waterfall |