CMMI认证

Information Management Resources, Inc.-2013-CMMI1

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Work is not performed differently based on this factor. All development projects follow IMRI’s OSP regardless of their geographic location.)
Customer (Not Relevant: Work is not performed differently based on the customer.)
Size (Not Relevant: All projects are less then 5 FTEs and follow the same IMRI OSP, regardless of size.)
Organizational Structure (Not Relevant: Work is not performed differently based on this factor. All projects follow the same organizational structure.)
Type of Work: The type of work is relevant with respect to the type of work and lifecycle model being used.
Sampling Factor Values: Waterfall (Type of Work): Projects following a traditional waterfall lifecycle for development activities.
Agile-based IV&V (Type of Work): Projects following an Agile-based lifecycle in support of IV&V.
Subgroups: Waterfall Subgroup: Projects following a traditional waterfall based lifecycle.
3 People, 1 Basic Units
– Waterfall
Agile-Based IV&V Subgroup: Projects following an Agile-based IV&V lifecycle.
2 People, 1 Basic Units
– Agile-based IV&V

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Information Management Resources, Inc.-2013-CMMI1