CMMI认证

Mercom Corporation-2017-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Mercom project operations include two locations: Pawley’s Island, SC and the Metropolitan Washington, DC area. Process implementation does not differ across these locations.)
Customer (Not Relevant: All in-scope projects are performed for internal customers with no differences in process implementation.)
Size (Not Relevant: All projects are of a similar size and use the same processes and templates with no significant differences in implementation.)
Organizational Structure (Not Relevant: All projects operate, are managed by, and report to the same senior management with no differences in implementation.)
Type of Work (Not Relevant: The organization’s projects use the waterfall lifecycle with no differences in process implementation.)
Single Subgroup: All Mercom projects
Sampling Factor Values: Projects (Single Subgroup): Mercom Projects
Null (Single Subgroup): to enable SAS entry
Subgroups: Mercom Projects: all projects
9 People, 2 Basic Units
– Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Mercom Corporation-2017-CMMI3