CMMI认证

MicroWise System Co., Ltd.-2018-CMMI3

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Single location (Xi’an, China). All BUs of OU are located in the same location. Therefor processes are not implemented differently.)
Customer (Not Relevant: Their customers are the mainly about the museum, so the customer type is single and does not affect the development of the software products or processes implemented.)
Size (Not Relevant: All projects are of a similar, relatively small size and size is not used as a discriminating factor in process selection.)
Organizational Structure (Not Relevant: The organizational structure does not affect the development of the software products or processes implemented.)
Type of Work (Not Relevant: They have development project and implementation project, but the implementation projects are excluded from the OU, so the type of work is not used as a discriminating factor in process selection.)
Type of Lifecycle: They classify the project lifecycle into waterfall and incremental, the work is done differently and the processes are implemented differently depending on the selected lifecycle model of the projects.
Sampling Factor Values: Waterfall (Type of Lifecycle): Waterfall type means the lifecycle model of the projects is waterfall.
Incremental (Type of Lifecycle): Incremental type means the lifecycle model of the projects is incremental
Subgroups: Waterfall: The lifecycle model of the projects in SG1 is Waterfall.
12 People, 3 Basic Units
– Waterfall
Incremental: The lifecycle model of the projects in SG2 is Incremental.
4 People, 1 Basic Units
– Incremental

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:MicroWise System Co., Ltd.-2018-CMMI3