CMMI认证

M.I. MONTREAL INFORMATICA S/A-2016-CMMI5

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: Not Relevant: Location has no impact on the way of working)
Customer (Not Relevant: Not Relevant: No difference in process is due to Customer requirements at this point)
Size (Not Relevant: Not Relevant: The size of the projects has no impact on the way of working)
Organizational Structure (Not Relevant: Not Relevant: One organizational structure, all projects are overseen by the operations manager.)
Type of Work (Not Relevant: Not Relevant: One type of work, software development.)
Uniqueness: All projects are of the same type. For the method we define 2 Factors: – All Projects (The general category all projects belong to) – No Projects (The empty set)
Sampling Factor Values: All Projects (Uniqueness): – All Projects (The general category all projects belong to)
No Projects (Uniqueness): – No Projects (The empty set)
Subgroups: All Projects: All Projects
27 People, 5 Basic Units
– All Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:M.I. MONTREAL INFORMATICA S/A-2016-CMMI5