| Sampling Factors: |
Location (Not Relevant: Single location (Nanjing))
Customer (Not Relevant: Customer is Industrial Enterprise, customer is not a relevant factor because processes do not distinguish any tailoring depending on customer.)
Size: Projects are generally divided into large and medium size. Size may affect requirement development, design and integration processes.
Organizational Structure (Not Relevant: All projects are within Software Development Department under the same management structure.)
Type of Work (Not Relevant: All projects are EMS.) |
| Sampling Factor Values: |
Large (Size): Effort in more than 30 person-months or code behavior 20000LOC or 50 function points above.
Medium (Size): Effort is less than 30 person-months or code behavior less than 20000LOC or less than 50 function points. |
| Subgroups: |
Large: Effort in more than 30 person-months or code behavior 20000LOC or 50 function points above
30 People, 3 Basic Units
– Large
Medium: Effort is less than 30 person-months or code behavior less than 20000LOC or less than 50 function points.
20 People, 2 Basic Units
– Medium |