| Sampling Factors: |
Location (Not Relevant: Work is performed in several sites, but methodology is the same, all the teams follow same processes according to companies strategy.)
Customer (Not Relevant: Customers don`t affect the way projects are performed. Requirements for the product can change, but methodology and processes followed in projects are not affected by the customer.)
Size (Not Relevant: Large, Medium & Small projects; size is used for organizing and reporting but complexity of all Project is high so all use the same methodology.)
Organizational Structure (Not Relevant: Structure depends on type of products. This factor is the same as type of work.)
Type of Work: The teams are group by type of product they develop |
| Sampling Factor Values: |
CS (Type of Work): Combat System
FCS (Type of Work): Fire Control System
IPMS (Type of Work): Integrated Platform Management Systems |
| Subgroups: |
CS: Combat System
68 People, 6 Basic Units
– CS
FCS: Fire Control System
17 People, 4 Basic Units
– FCS
IPMS: Integrated Platform Management Systems
35 People, 3 Basic Units
– IPMS |