| Sampling Factors: |
Location (Not Relevant: Discussed with sponsor and IPT Lead – not a factor. Team is at a single location. No process differences.)
Customer (Not Relevant: Discussed with sponsor and IPT Lead – not a factor. Single customer. No process differences.)
Size (Not Relevant: Discussed with sponsor and IPT Lead – not a factor. No process differences.)
Organizational Structure (Not Relevant: Discussed with sponsor and IPT Lead – not a factor. Single IPT. No process differences.)
Type of Work (Not Relevant: Discussed with sponsor and IPT Lead – not a factor. No process differences.)
One Project: This factor is to accomodate the entire OU |
| Sampling Factor Values: |
Whole OU (One Project): The subgroup that contains only the EPS GW project with 42 FTEs. * Number of Basic Units: 1 * Number of People: 42
Null (One Project): |
| Subgroups: |
EPS GW Project: EPS GW Project
42 People, 1 Basic Units
– Whole OU |