CMMI认证

Northrop Grumman-2017-CMMI5

Sampling Summary:
(抽样汇总)
Sampling Factors: Location (Not Relevant: The organizational unit consists of a single project doing business at a single geographic location.)
Customer (Not Relevant: The organizational unit consists of a single project with a single customer, the US Air Force.)
Size (Not Relevant: The organization consists of a single project.)
Organizational Structure (Not Relevant: The organization consists of a single project managed by one project manager as a single unit)
Type of Work (Not Relevant: The organization consists of a single project.)
Entire Organizational Unit: This sampling factor reflects the fact that the entire organizational unit is in a single subgroup.
Sampling Factor Values: All Projects (Entire Organizational Unit): This value applies to the single project in the organizational unit.
No projects (Entire Organizational Unit): This value applies to no projects in the organizational unit.
Subgroups: All Projects: This subgroup contains the single project in the organizational unit.
175 People, 1 Basic Units
– All Projects

版权所有丨如未注明 , 均为原创丨本网站采用BY-NC-SA协议进行授权
转载请注明原文链接:Northrop Grumman-2017-CMMI5